Works has been slow this week as the electrician kinda took his own sweet time, resulting in a delay in the putting up of false ceiling.
We engaged two different co. for electrical and renovation cause of the price difference.
No choice. Everything also must save.
Nonetheless, everything else is going quite smoothly. This week, the hacked kitchen walls and floor has been touched up. Aircon pipings are up and connected too. Should be expecting the false ceiling to be up by next week.
Works has been slow this week as the electrician kinda took his own sweet time, resulting in a delay in the putting up of false ceiling.
We engaged two different co. for electrical and renovation cause of the price difference.
No choice. Everything also must save.
Nonetheless, everything else is going quite smoothly. This week, the hacked kitchen walls and floor has been touched up. Aircon pipings are up and connected too. Should be expecting the false ceiling to be up by next week.